2022–23 Annual Report of the Commission of the Canada Energy Regulator – Appendix D: Time Limits

2022–23 Time Limits

The following graphic and table shows applications which were subject to time limits for processing as per the CER Act. All time limits were met in 2022–23.

Percentage of Decisions – Grouped by Days Remaining on Time Limits

Percentage of Decisions – Grouped by Days Remaining on Time Limits

Graphic description

Percentage of Decisions – Grouped by Days Remaining on Time Limits

Percentage of Decisions Grouped by Days Remaining on Time Limits

Time Limit Exceeded

< 50 days Remaining
on Time Limit

50 – 100 days Remaining
on Time Limit

> 100 days Remaining
on Time Limit

0%

23%

15%

62%

Under the CER Act, the Lead Commissioner must set a time limit for certain types of applications. The time limit must not exceed the maximum number of days stated in the CER Act. The Commission must complete its assessment and make its recommendation or decision within this time limit. The standard time limits set by the Lead Commissioner can be found on the CER website.

Applications processed subject to time limits:

Applications processed subject to time limits

Legislation

Application Type

Time Limit

Application

Days from Completeness to Decision Issued

Decision

Date of Decision
(YYYY-MM-DD)

CER Act,
section 214

Small Pipeline Infrastructure – Category B

210 days
from
application complete

Westcoast Energy Inc – application to construct and operate – Meter Station 21 Replacement Project

62

[Filing C18469]

2022-04-05

CER Act,
section 214

Small Pipeline Infrastructure – Category A

130 days from application complete

Enbridge Pipelines Inc. – application to construct and operate – Edmonton Terminal Trap Enhancement Project

29

[Filing C18470]

2022-04-06

CER Act,
section 214

Small Pipeline Infrastructure – Category B

210 days
from
application complete

Trans Mountain Pipeline ULC application to install two (2) new NPS 12 meter runs at Meter Bank 4 and the associated piping for transfer of product to tankage and proving activities

49

[Filing C18727]

2022-04-22

CER Act, section 183

Large Pipeline Infrastructure

450 days from application complete

NOVA Gas Transmission Ltd. – Application to construct and operate the NGTL West Path Delivery 2023 Project

406

[Filing C19229]

2022-05-05

CER Act,
section 214

Small Pipeline Infrastructure – Category C

300 days
from
application
complete

Steel Reef Pipelines Canada Corp.- application for the construction and operation of the Sinclair Pipeline Project

115

[Filing C19189]

2022-05-13

CER Act,
section 344

Export or Import Licences

6 months from application complete

AltaGas LPG General Partner Inc. on behalf of AltaGas LPG Limited Partnership application for a licence authorizing the export of butane

143

[Filing C19687]

2022-06-13

CER Act,
section 214

Small Pipeline Infrastructure – Category B

210 days
from
application complete

Westcoast Energy Inc. application to construct and operate – CS-08B Piping Replacement

61

[Filing C20016]

2022-07-04

CER Act,
section 214

Small Pipeline Infrastructure – Category B

210 days
from
application complete

Steel Reef Pipelines Canada Corp application to construct and operate – North Portal Pipeline Lateral Project

38

[Filing C20222]

2022-07-22

CER Act,
section 214

Small Pipeline Infrastructure – Category A

130 days from application complete

NOVA Gas Transmission Ltd. – Leismer Ethane Extraction Plant Tie-in Project

30

[Filing C21194]

2022-09-29

CER Act,
section 214

Small Pipeline Infrastructure – Category B

210 days
from
application complete

NOVA Gas transmission Ltd – Albersun Horse River HDD Replacement Project

55

[Filing C21682]

2022-10-26

CER Act,
section 344

Export or Import Licences

6 months from application complete

Ksi Lisims LNG GP Ltd., on behalf of Ksi Lisims LNG Limited Partnership – Application for a 40-year Gas Export Licence

152

[Filing C22526]

2022-12-14

CER Act,
section 214

Small Pipeline Infrastructure – Category B

210 days
from
application complete

TransCanada PipeLines Limited – Geraldton Meter Station Expansion Project

47

[Filing C23446]

2023-02-28

CER Act,
section 214

Small Pipeline Infrastructure – Category A

130 days from application complete

Trans Mountain Pipeline ULC – Application for the Meter Bank 2 Expansion (MB2X)

37

[Filing C23497]

2023-03-02