Regulated industry engagement
The Canada Energy Regulator (CER) is committed to enhancing Canada’s global competitiveness by improving transparency, predictability, and efficiency throughout the regulatory lifecycle, while driving innovation that contributes to the transition to a low carbon economy. The Government of Canada has also signaled its commitment to global competitiveness through the preamble of the Canadian Energy Regulator Act. These commitments will be fulfilled through ongoing dialogue with regulated companies, which will support CER and industry innovation to meet the changing needs of Canadians and the energy sector.
The CER prepares the Meeting Minutes based on discussions at the meetings. Any views and opinions expressed may not reflect the views of the CER or other companies whose representatives were present.
Regulated Industry Engagement (RIE) Meeting May 27, 2024 – Meeting Minutes
Date: May 27, 2024
Time: 9:00 am to 10:30 am
Virual meeting
Item, Description and Outcome |
Discussion Lead |
---|---|
Item 1 – Introductions |
|
Introductions and Housekeeping |
CER: Jonathan Timlin, VP, System Operations |
Item 2 – Welcome/ Land Acknowledgement/Introduction |
|
Welcome/Land Acknowledgement/Introduction |
CER: Chris Loewen, EVP, Regulatory |
Item 3 – Opening Remarks (including staffing updates at the CER) |
|
Staffing updates at the different leadership levels |
CER: Chris Loewen, EVP, Regulatory |
Item 4 – Efficient processing of negligible-risk and low-risk applications |
|
For awareness: Update on 30-day completeness. Provide a high-level overview of proposed processes for negligible-risk and low-risk applications (section 214, and decommissioning activities). Share an update on upcoming engagement opportunities. For discussion: Opportunity to share any early feedback and input on the proposed processes. Key Takeaways:
|
CER: Blair Reilly, Director, Facilities Adjudication, West Usha Mulukutla, Technical Leader, Facilities Adjudication, West |
Item 5 – Regulatory Framework Plan 2024-2027 |
|
For awareness: Provide an overview of ongoing and planned Regulatory Framework improvement projects, including regulatory development led by NRCan where the CER participates, which will appear on the 2024-2027 Regulatory Framework Plan (RFP). For discussion: Opportunity to pose questions and provide feedback on the CER’s priorities for Regulatory Framework improvement and the RFP. Delivery of Regulatory Framework Survey to seek feedback (Regulatory Framework Survey | CER Dialogue- Canada.ca). Key Takeaways:
|
CER: Melissa Mathieson Acting Director, Regulatory Policy |
Item 6 – Upcoming engagement for the OPR and FM update project |
|
For awareness: Provide an update on the Onshore Pipeline Regulations (OPR) and Filing Manual (FM) review project and share upcoming engagement opportunities. For discussion: Receive feedback on areas of interest for Phase 2. Key Takeaways:
|
CER: Don Logan, Technical Leader, OPR/FM Project Manager, Regulatory Policy |
Item 7 – Miscellaneous Updates |
|
For awareness (updates):
Key Takeaways: EF 2025
Audits
Federal budget and regulatory efficiencies
|
CER: Jonathan Timlin, VP, System Operations |
Item 8 – Next Steps |
|
Key takeaways:
|
CER: Chris Loewen, EVP, Regulatory |
Participants
Regulated Companies | CER |
---|---|
ARC Resources Ltd. Cenovus Centra Transmission Holdings Inc. Emera Brunswick Pipeline Company Ltd Enbridge Pipelines Inc. Energir Energy Connections Canada Husky Midstream Kingston Midstream Westspur Limited LBX Pipeline Ltd. Many Islands Pipe Lines (Canada) Limited (MIPL) NorthRiver Midstream Pembina Plains Midstream Canada ULC Steel Reef Infrastructure Corp. TAQA North TC Energy Trans Mountain Canada Inc. Trans-Northern Pipelines Inc. Westover Express Pipeline Limited Whitecap Resources |
Chris Loewen, EVP, Regulatory Jonathan Timlin, VP, System Operations Melissa Mathieson, A/Director, Regulatory Policy Andrew Strople, A/Director, Research & Innovation Jess Dunford, VP, Field Operations Blair Reilly, Director, Facilities Adjudication, WEST Erin Tabah, Director, Facilities Adjudication, EAST Chioma Izugbokwe, A/VP, Energy Adjudication Josh Brading, A/Director Public Participation Suzanne Brown, Director, Construction Oversight |
Regulated Industry Engagement (RIE) Meeting November 23, 2023 – Meeting Minutes
Date: November 23, 2023
Time: 8:00 am to 12:00 pm
Online meeting
Item, Description and Outcome |
Discussion Lead |
---|---|
Item 1 – Introductions |
|
Introductions and Housekeeping |
Anne-Marie Erickson |
Item 2 – Welcome/ Land Acknowledgement/Introduction |
|
Land Acknowledgement and Opening remarks |
Tracy Sletto Paula Futoransky |
Item 3 – Preparing for the Energy Future |
|
Presentation and Discussion on the following topics:
Key themes identified during discussion on preparing for the energy future:
|
Jonathan Timlin Jean-Denis Charlebois |
Item 4 – Contractor Oversight |
|
Presentation and discussion on:
Key themes identified during discussion on contractor oversight:
|
Peter Budgell |
Item 5 – Crown Consultation |
|
Presentation and Discussion on:
Key themes identified during discussion on crown consultation:
|
Carly Milne |
Item 6 – Updates and Next Steps |
|
Presentation and Discussion on:
Key themes identified during discussion on Regulatory Efficiency Project Updates:
|
Paula Futoransky Blair Reilly |
Item 7 – Session for Group 2 Companies |
|
Presentation and discussion on:
Key themes identified during discussion for group 2 companies:
|
Kathryn Milne |
Item 8 – Next Steps |
|
|
Paula Futoransky |
Participants
Regulated Group 1 and Group 2 Companies | |
---|---|
Alliance Pipeline Limited Partnership ARC Resources Campus Energy Partners Operations Inc. Canadian Association of Petroleum Producers Canadian Natural Resources Ltd. Cenovus Centra Transmission Holdings Inc. Corporation Champion Pipe Line Limitée Emera Brunswick Pipeline Company Ltd Enbridge Pipelines Inc. Energy Connections Canada FortisBC Energy Inc. Husky Midstream Kingston Midstream |
LBX Pipeline Ltd. Milk River Pipeline Ltd. NorthRiver Midstream Ovintiv Canada ULC PKM Cochin ULC Plains Midstream SaskEnergy Incorporated Steel Reef Pipelines Canada Corp. TAQA North TC Energy TransMountain Trans-Northern Pipelines Inc. (TNPI) Westcoast Energy Inc. |
Regulated Industry Engagement (RIE) Meeting May 2, 2023 – Meeting Minutes
Date: May 2, 2023
Time: 8:00 am to 12:00 pm
Online meeting
Item, Description and Outcome |
Discussion Lead |
---|---|
Item 1 – Welcome/ Land Acknowledgement/ Introduction |
|
Land Acknowledgement and Opening remarks |
Gitane De Silva |
Item 2 – Introductions |
|
Introductions and Housekeeping |
Tanya Stevenson |
Item 3 – Upcoming Regulatory Changes |
|
Presentation and discussion on:
Key themes identified during discussion on Upcoming Regulatory Changes:
|
Sandy Lapointe Céline Sirois |
Item 4 – Regulatory Efficiency Projects |
|
Presentation and discussion on:
Key themes identified during discussion on Regulatory Efficiency Projects:
|
Paula Futoransky |
Item 5 – Best Practices |
|
Presentation and discussion on:
Key themes identified during discussion on Best Practices:
|
Marc Pauzé |
Item 6 – Next Steps |
|
|
Sandy Lapointe |
Item 7 – Adjournment |
|
|
Tanya Stevenson |
Participants
Regulated Group 1 and Group 2 Companies | CER |
---|---|
ARC Resources Ltd. Canadian Natural Resources Limited Cenovus Energy Inc. Champion Pipe Line Corporation Limited Emera Brunswick Pipeline Company Ltd. Enbridge Pipelines Inc. FortisBC Huntingdon Inc. Genesis Pipeline Canada Ltd. Kingston Midstream Westspur Limited LBX Pipeline Ltd. Many Islands Pipe Lines (Canada) Limited Montreal Pipe Line Limited NorthRiver Midstream G and P Canada Pipelines Inc. Pembina Pipeline Corporation Plains Midstream Canada ULC TAQA NORTH by its managing partner TAQA NORTH Ltd. TC Energy Trans Mountain Pipeline ULC Trans-Northern Pipelines Inc. Vector Pipeline Limited Partnership Westover Express Pipeline Limited |
Gitane De Silva (CEO) – Attended Item 1 ONLY Sandy Lapointe (EVP, Regulatory) Céline Sirois (Director, Regulatory Policy) Paula Futoransky (VP, Energy Adjudication) Marc Pauzé (A/VP- Field Operations) |
Regulated Industry Engagement (RIE) Pilot Meeting October 19, 2022 – Meeting Minutes
Date: October 19, 2022
Time: 8:00 am to 12:00 pm
Hybrid in-person and online meeting
Item, Description and Outcome |
Discussion Lead |
---|---|
Item 1 – Welcome/ Land Acknowledgement/ Introduction |
|
|
Gitane De Silva |
Item 2 – Presentation: CER Context |
|
Overview of the three pillars of CER governance and their roles in the organization:
Discussion of the drivers the CER has observed to be shaping the direction of the pipeline industry:
Overview of CER’s Strategic Priorities:
|
Sandy Lapointe Tracy Sletto |
Item 3 – Presentation: Introduction to Regulated Industry Engagement |
|
Overview of the RIE initiative
|
Jim Fox |
Item 4 – Discussion on Topics |
|
Discussed CER – identified and Industry- identified topics to formulate RIE priorities, including:
|
Thom Stubbs |
Item 5 – Workshop: Supporting Continuous Dialogue and Action |
|
Key themes identified in the workshops:
|
Thom Stubbs CER |
Item 6 – Next Steps and Adjournment |
|
|
Thom Stubbs |
Participants
Regulated Group 1 and Group 2 Companies | CER |
---|---|
Campus Energy Partners LP Cenovus Energy CNRL Champion Pipe Line Corporation Limited Enbridge Inc.Table Note a FortisBC Huntingdon Inc. (HIPCO) Harvest Operations Corp. 1057533 Alberta ISH Energy Ltd. Kingston Midstream Westspur Limited Kingston Midstream Virden Limited Many Islands Pipe Lines (Canada) Limited Milk River Pipeline Ltd NorthRiver Midstream Ovintiv Pembina Pipelines Plains Midstream Steel Reef Infrastructure Corp TAQA North TC EnergyTable Note b Trans Mountain Canada Inc. Trans-Northern Pipelines Inc. Vector Pipeline Limited Vermilion Energy Westover Express Pipeline Limited |
Gitane De Silva (CEO) – Attended for Item 1 ONLY Sandy Lapointe (EVP-Regulatory) Tracy Sletto (EVP-Transparency and Strategic Engagement) Jim Fox (VP-Regulatory Strategy and Coordination) Céline Sirois (Director-Regulatory Strategy and Coordination) Paula Futoransky (VP-Energy Adjudication) Barb van Noord (VP-System Operations) Marc Pauzé (A/VP-Field Operations) |
- Date modified: