ARCHIVED - Nova Gas Transmission Ltd. - Erratum to Cover Letter for Order SG-N081-001-2014
This page has been archived on the Web
Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.
Nova Gas Transmission Ltd. - Erratum to Cover Letter for Order SG-N081-001-2014 [PDF 989 KB]
File OF-Surv-Inc-2014-33 01
14 March 2014
Mr. Declan Russell
Regulatory Compliance Specialist
TransCanada PipeLines Limited
450 - 1st Street SW
Calgary, AB T2P 5H1
Facsimile 403-920-2319
Dear Mr. Russell:
Nova Gas Transmission Ltd. (NGTL)
Erratum to Cover Letter for Order SG-N081-001-2014
It has come to the National Energy Board’s (Board) attention that the cover letter issued with Order SG-N081-001-2014 (Order) contains an error.
The first full paragraph on page 2 of the letter contains a sentence which states as follows:
The attached Safety Order directs TransCanada to operate the affected pipelines in the NGTL system at 20% of the 90 day highest pressure prior to the date of this Order.
Consistent with Condition 1 of the Order, this sentence should instead state as follows:
The attached Safety Order directs TransCanada to reduce the affected pipelines in the NGTL system by 20% of the 90 day highest pressure from the date of the Order.
The Board apologizes for any inconvenience this may have caused, and this correction will be posted with the Order on the Board’s website.
Yours truly,
Sheri Young
Secretary of the Board
- Date modified: