Notice to Resume Work or of Measures Satisfied – Enbridge Pipelines Inc. – Order AML-001-2018

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE NATIONAL ENERGY BOARD ACT,
FOLLOWING AN ORDER UNDER SECTION 51.1

The undersigned National Energy Board Inspection Officer hereby notifies

Information not available

Enbridge Pipelines Inc. that the hazardous or detrimental situation described in Order No. AML-001-2018 has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •  X  Suspended work may resume, and/or
  •  X  the measures specified in the order have been satisfied.

Dated: 26 August 2018

Inspection Officer
Inspection Officer Information not available 2619 Information not available
Name IO Designation # Telephone
26 August 2018 Information not available
Signature
Date