Notice to Resume Work or of Measures Satisfied – Enbridge Pipelines Inc. – Order AML-001-2018
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE NATIONAL ENERGY BOARD ACT,
FOLLOWING AN ORDER UNDER SECTION 51.1
The undersigned National Energy Board Inspection Officer hereby notifies
Enbridge Pipelines Inc. that the hazardous or detrimental situation described in Order No. AML-001-2018 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- X Suspended work may resume, and/or
- X the measures specified in the order have been satisfied.
Dated: 26 August 2018
Inspection Officer | 2619 | ||
---|---|---|---|
Name | IO Designation # | Telephone | |
26 August 2018 | Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |