ARCHIVED – Notice to Resume Work or of Measures Satisfied – NOVA Gas Transmission Ltd. – Order AML-002-2018
This page has been archived on the Web
Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE NATIONAL ENERGY BOARD ACT,
FOLLOWING AN ORDER UNDER SECTION 51.1
The undersigned National Energy Board Inspection Officer hereby notifies
Nova Gas Transmission Ltd.
the hazardous or detrimental situation described in Order No. AML-002-2018 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- X suspended work may resume, and/or
- X the measures specified in the order have been satisfied.
Dated: 02 Dec 2018
Inspection Officer | |||
---|---|---|---|
Name | IO Designation # | Telephone | |
02 Dec 2018 | Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
CVA or Incident #: CV1819-525
- Date modified: