Notice to Resume Work or of Measures Satisfied – Westcoast Energy Inc., carrying on business as Spectra Energy Transmission – Order NB-001-2018 (Amendment No. 3) – Notice No. 8

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies:

Information not available

Westcoast Energy Inc., carrying on business as Spectra Energy Transmission that the hazardous or detrimental situation described in Order No. NB-001-2018 (Amendment No. 3) has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •     suspended work may resume, and/or
  •     the measures specified in the order have been satisfied.
  •  X Specified Measure of the order has been satisfied for Segment 8AL2 of the NPS 36 L2 for operation at its Maximum Operating Pressure
Inspection Officer
Inspection Officer Information not available Information not available Information not available
Name IO Designation # Telephone
10/16/2019 Information not available
Signature
Date
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA or Incident #: INC2018-142

Date modified: