Notice to Resume Work or of Measures Satisfied – Trans-Northern Pipelines Inc. (TNPI) – Order LJP-001-2019
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE NATIONAL ENERGY BOARD ACT,
FOLLOWING AN ORDER UNDER SECTION 51.1
The undersigned National Energy Board Inspection Officer hereby notifies
of Trans-Northern Pipelines Inc. (TNPI) that the hazardous or detrimental situation described in Order No. LJP-001-2019 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- suspended work may resume, and/or
- X the measures specified in the order have been satisfied.
Inspection Officer | |||
---|---|---|---|
Name | IO Designation # | Telephone | |
3 June 2019 | Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
CVA or Inicident #: 1819-574
- Date modified: