Notice to Resume Work or of Measures Satisfied – Trans-Northern Pipelines Inc. (TNPI) – Order LJP-001-2019

Notice to Resume Work or of Measures Satisfied – Trans-Northern Pipelines Inc. (TNPI) – Order LJP-001-2019 [PDF 157 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE NATIONAL ENERGY BOARD ACT,
FOLLOWING AN ORDER UNDER SECTION 51.1

The undersigned  National Energy Board Inspection Officer hereby notifies

Information not available of Trans-Northern Pipelines Inc. (TNPI) that the hazardous or detrimental situation described in Order No. LJP-001-2019 has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •       suspended work may resume, and/or
  •  X  the measures specified in the order have been satisfied.
Inspection Officer
Inspection Officer Information not available Information not available Information not available
Name IO Designation # Telephone
3 June 2019 Information not available
Signature
Date
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA or Inicident #: 1819-574

Date modified: