Notice to Resume Work or of Measures Satisfied – TC Energy – Order TH-001-2019
Notice to Resume Work or of Measures Satisfied – TC Energy – Order TH-001-2019 [PDF 523 KB]
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
TC Energy that the hazardous or detrimental situation described in Order No. TH-002-2019 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- suspended work may resume, and/or
- X the measures specified in the order have been satisfied.
Inspection Officer | |||
---|---|---|---|
Name | IO Designation # | Telephone | |
8 April 2022 | _______________________________ Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
- Date modified: