Notice to Resume Work or of Measures Satisfied – Order BL-001-2020-AMENDED
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
that the hazardous or detrimental situation described in Order No. BL-001-2020-AMENDED has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- X suspended work may resume, and/or
- the measures specified in the order have been satisfied.
Inspection Officer | |||
---|---|---|---|
Name | IO Designation # | Telephone | |
27 July 2020 | Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
CVA or Incident #: UX2020-048
- Date modified: