Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC – Order SLM-001-2020

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies:

Information not available

Supervisor Pipeline Integrity, Trans Mountain Pipeline ULC that the hazardous or detrimental situation described in Order No. SLM-001-2020 has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •       suspended work may resume, and/or
  •  X  the measures specified in the order have been satisfied.
Inspection Officer
Inspection Officer Information not available Information not available Information not available
Name IO Designation # Telephone
10 dec 2020 Information not available
Signature
Date
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA or Incident #: CVA 2021-201

Date modified: