Notice to Resume Work or of Measures Satisfied – Many Islands Pipe Lines (Canada) Limited – Order DM-001-2021
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
, Construction Superintendent
Many Islands Pipe Lines (Canada) Limited, (MIPL(C) L), a wholly owned subsidiary of SaskEnergy Incorporated, a provincial crown corporation in the Province of Saskatchewan
that the hazardous or detrimental situation described in Order No. DM-001-2021 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- X suspended work may resume, and/or
- X the measures specified in the order have been satisfied.
Inspection Officer | (403) 292 4800 | ||
---|---|---|---|
Name | IO Designation # | Telephone | |
Feb 02, 2021 | Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
CVA or Incident #: CVA 2021-120
- Date modified: