Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC – Order DRP-002-2021 (AMENDED) – Notice No. 2
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
,
Trans Mountain Pipeline ULC that the hazardous or detrimental situation described in Order No. DRP-002-2021 (AMENDED) has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- X suspended work may resume, and/or
- X all measures specified in the order have been satisfied.
Inspection Officer | |||
---|---|---|---|
Name | Inspection Officer Designation Number |
Telephone | |
September 2, 2021 | Signature |
||
Date | |||