Notice to Resume Work and Measures Partially Satisfied – NOVA Gas Transmission Ltd. (NGTL) – Order DRP-001-2022
NOTICE TO RESUME WORK AND MEASURES PARTIALLY SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies NOVA Gas Transmission Ltd. (NGTL) that the hazardous or detrimental situation described in Order No. DRP-001-2022 (AMENDED) has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- X Suspended work may resume.
- X Specified measure 1 of the order has been satisfied. Specified measure 2 of DRP-001-2022 (AMENDED) remains in place until the CAPA provided under specified measure 2 in DRP-001-2022 is fully implemented
Inspection Officer | |||
---|---|---|---|
Name | Inspection Officer Designation Number | Telephone | |
29 September 2022 | Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
CVA or incident number: CV2223-270 | INC2022-149