Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC – Order BL-001-2023

Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC – Order BL-001-2023 [PDF 117 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies Trans Mountain Pipeline ULC (Trans Mountain) that the hazardous or detrimental situation described in Order No. VAR-001-BL-001-2023 has been fully remedied to the satisfaction of the Inspection Officer.

Therefore,

  •     suspended or stopped work may resume
  •  X the measures specified in the Order have been satisfied
Inspection Officer

Inspection Officer

09 January 2024

Information not available

Date

Name

Information not available

Information not available

IO Designation Number

Signature

210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA number: CV2324-102

Date modified: