Notice to Resume Work or of Measures Satisfied – NOVA Gas Transmission Ltd. (NGTL) – Order DRP-001-2024

Notice to Resume Work or of Measures Satisfied – NOVA Gas Transmission Ltd. (NGTL) – Order DRP-001-2024 [PDF 515 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies:

NOVA Gas Transmission Ltd. (NGTL) that the hazardous or detrimental situation described in Order No. DRP-001-2024 has been remedied to the satisfaction of the Inspection Officer.

Therefore,

  •  X suspended work may resume, and/or
  •  X  the measures specified in the order have been satisfied.
Inspection Officer
Inspection Officer 18 April 2024
Date
Information not available Information not available
IO Designation Number Signature
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA number: CV2425-295