Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC (Trans Mountain) – Order  VAR-001-JJD-001-2024

Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC (Trans Mountain) – Order  VAR-001-JJD-001-2024 [PDF 560 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies Trans Mountain Pipeline ULC (Trans Mountain) that the hazardous or detrimental situation described in Order No. VAR-001-JJD-001-2024 has been fully remedied to the satisfaction of the Inspection Officer.

Therefore,

  •  X suspended or stopped work may resume
  •  X the measures specified in the Order have been satisfied
Inspection Officer
Inspection Officer 24 April 2024 Information not available
Date Name
Information not available Information not available
IO Designation Number Signature
210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA number: CV2324-299

Date modified: