Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC – Order RRW-001-2024

Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC – Order RRW-001-2024 [PDF 338 KB]

NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)

The undersigned Canada Energy Regulator Inspection Officer hereby notifies:
Trans Mountain Pipeline ULC that the hazardous or detrimental situation described in Order No. RRW-001-2024 has been partially remedied to the satisfaction of the Inspection Officer.

Therefore,

  •     suspended work may resume, and/or
  •     the measures specified in the Order have been satisfied
  •  X Specified measures 1, 2 and 3 of the Order have been satisfied. Specified measures 4 and 5 of Order RRW-001-2024 remain in place.
Inspection Officer

Inspection Officer

3 December 2024

Information not available

Date

Name

Information not available

Information not available

IO Designation Number

Signature

210-517 10 Ave SW, Calgary AB  T2R 0A8

CVA number: CV2425-351