CER Event Reporting Guidelines 2024 – Table of Concordance
CER Event Reporting Guidelines 2024 – Table of Concordance [PDF 98 KB]
Attachment 2 to CER letter
dated 29 January 2024
2020 Event Reporting Guidelines |
2024 Draft Event Revised Guidelines |
Areas of Improvement |
---|---|---|
1.0 Goal |
1.0 Purpose |
Administrative revision |
2.0 Background |
2.0 Scope |
Administrative revision |
2.1 CER & TSB Single Window Reporting |
3.0 CER Oversight of Event Reporting |
|
2.2 Precautionary Approach |
3.1 CER & TSB Single Window Reporting |
Added TSB Reporting Hotline phone number and link to the Online Event Reporting System |
2.3 CER Oversight of Event Reporting |
3.2 Precautionary Approach |
Administrative revision |
3.0 Immediately Reportable Events |
3.3 Data and Resources |
Administrative revision |
4.0 Multiple Incident Types |
4.0 Immediately Reportable Events |
|
|
4.1 Verbal and written notification within 3 hours |
Significant Pollution (under COGOA and OGOA Drilling and Production Regulations) added as an Immediately Reportable Event |
|
4.2 Written notification within 24 hours |
Administrative revision |
5.0 CER Onshore Pipeline Regulations (OPR) |
5.0 CER Onshore Pipeline Regulations (OPR) |
|
5.1 Definition of “Incident” |
5.1 OPR Glossary |
Added a glossary |
5.1.1 “The death of or serious injury to a person” |
5.2 OPR Incident Reporting |
|
5.1.2 “Significant adverse effect on the environment” |
5.2.1 The death of or serious injury to a person |
Added sternum and rib as “major bone” |
5.1.3 “An unintended fire or explosion” |
5.2.2 Significant adverse effect on the environment |
Clarified the CER’s expectations in relation to Significant Adverse Effect on the Environment. Improved examples of events that require notification.
|
5.1.4 “An unintended or uncontrolled release of gas or high-vapour pressure (HVP) hydrocarbons” |
5.2.3 Unintended fire or explosion |
Administrative revision |
5.1.5 “Operation of pipeline beyond its design limits...” |
5.2.4 Unintended or uncontrolled release of gas of HVP hydrocarbons |
Updated formula that companies can use for the purposes of estimating release rate |
5.1.6 Reporting Timelines |
5.2.5 Operation of a pipeline beyond its design limits |
Added definitions for Approved MOP, Qualified MOP, Amended MOP, Restricted MOP, and Self-Imposed Pressure Restriction |
5.2 Annual Report Notifications |
5.3 OPR Incident Reporting Timelines |
|
|
5.4 OPR Annual Report Notifications |
Administrative revision |
6.0 CER Processing Plant Regulations (PPR) |
6.0 CER Processing Plant Regulations (PPR) |
|
6.1 Definition of “Incident” |
6.1 PPR Glossary |
Added a glossary |
6.1.1 An unintended fire or explosion |
6.2 PPR Incident Reporting |
Administrative revision |
6.1.2 An unintended or uncontrolled release of gas, HVP hydrocarbons, hydrogen sulfide or other poisonous gas |
6.2.1 An unintended fire or explosion |
|
6.1.3 Unintended or uncontrolled releases of processing or hydrocarbon fluids |
6.2.2 An unintended or uncontrolled release of gas, HVP hydrocarbons, hydrogen sulfide or other poisonous gas |
Updated formula that companies can use for the purposes of estimating release rate |
6.1.4 Operation of a plan beyond its design limits or any limits imposed by the CER |
6.2.3 Unintended or uncontrolled releases of processing or hydrocarbon fluids |
Administrative revision |
6.1.5 Reporting Timelines |
6.2.4 Operation of a plant beyond its design limits or any limits imposed by the CER |
References have been added as footnotes |
6.2 Hazard that Renders the Plant Unsafe to Operate |
6.2.5 Reporting Timelines |
|
6.2.1 Reporting Timelines |
6.3 Hazard that Renders the Plant Unsafe to Operate |
|
6.3 Emergency Burning or Flaring |
6.3.1 Hazard Reporting Timelines |
|
6.3.1 Reporting Timelines |
6.4 Emergency Burning and Flaring |
|
6.4 Suspension of Operations |
6.4.1 Emergency Burning or Flaring Reporting Timelines |
|
6.4.1 Reporting Timelines |
6.5 Suspension of Operations |
|
|
6.5.1 Suspension of Operations Reporting Timelines |
|
7.0 CER Pipeline Damage Prevention Regulations |
7.0 CER Pipeline Damage Prevention Regulations (CER DPR) |
|
7.1 Contraventions of DPR–A |
7.1 CER DPR Glossary |
Added a glossary |
7.2 Damage to Pipe |
7.2 CER DPR Event Reporting |
|
7.3 Suspension of Consent |
7.2.1 Contraventions of DPR–A |
|
7.4 Reporting Timelines |
7.2.2 Damage to Pipe |
Added pipeline system components such as valves and risers |
|
7.3 Suspension of Consent |
|
|
7.4 CER DPR Reporting Timelines |
|
8.0 Canada Oil and Gas Drilling and Production Regulations under COGOA (COG–DPR) |
8.0 Canada Oil and Gas Drilling and Production Regulations under COGOA (COG–DPR) and Oil and Gas Drilling and Production Regulations under OGOA (OG–DPR) |
Added OG–DPR |
8.1 Incident Reporting |
8.1 COG–DPR and OG–DPR Glossary |
Added a glossary |
8.1.1 “A loss of containment of any fluid from a well” |
8.2 COG–DPR and OG–DPR Incident and Near Miss Reporting |
|
8.1.2 “Imminent threat to the safety of a person, installation or support craft” |
8.2.1 A loss of containment of any fluid from a well |
|
8.1.3 “Pollution” and significant pollution |
8.2.2 Imminent threat to the safety of a person, installation or support craft |
|
8.2 “Near-Miss” |
8.2.3 Pollution and Significant Pollution |
Clarified the CER’s expectations in relation to Significant Pollution. Improved examples of events that require notification. |
8.3 Reporting Timelines |
8.3 Reporting Timelines |
|
|
8.3.1 Press release or press conference |
Administrative revision |
|
8.3.2 Investigation report |
Administrative revision |
9.0 Canada Oil and Gas Geophysical Operations Regulations (GOR) |
9.0 Canada Oil and Gas Geophysical Operations Regulations (COG–GOR) and Oil and Gas Geophysical Operations Regulations (OG–GOR) |
Added OG–GOR |
9.1 Serious accident or incident reporting |
9.1 Serious accident or incident reporting |
Administrative revision |
9.1.1 “Property” |
9.1.1 Damage to property |
Administrative revision |
9.1.2 “Threat to the environment” |
9.1.2 Threat to the environment |
Administrative revision |
9.2 Reporting timelines |
9.2 Reporting timelines |
Administrative revision |
10.0 Canada Oil and Gas Installations Regulations (COGIR) |
10.0 Canada Oil and Gas Installations Regulations (COG–IR) and Oil and Gas Installations Regulations (OG–IR) |
Added OG-IR |
10.1 Emergency or accident reporting |
10.1 Emergency or accident reporting |
Administrative revision |
10.2 Reporting timelines |
10.2 Reporting timelines |
Administrative revision |
|
|
|
11.0 Canada Oil and Gas Diving Regulations (DR) |
11.0 Canada Oil and Gas Diving Regulations (COG–DR) and Oil and Gas Diving Regulations (OG–DR) |
Added OG-DR |
11.1 Accident, illness, and incident reporting |
11.1 Accident, illness, and incident reporting |
Administrative revision |
11.2 Reporting timelines |
11.2 Reporting timelines |
Administrative revision |
12.0 Information Requirements for Reporting Events |
12.0 International and Interprovincial Power Line Damage Prevention Regulations (IPLDPR) |
Added IPLDPR |
12.1 Incident Reporting |
12.1 Reporting Timelines |
|
12.1.1 Notification and Preliminary Incident Report |
13.0 Event Reporting Information Requirements |
Administrative revision |
12.1.2 Detailed Incident Reports |
13.1 Incident Reporting |
Administrative revision |
12.1.3 Incident Costs |
13.1.1 Notification and Preliminary Incident Report (PIR) |
Administrative revision |
12.2 Near-Miss Reporting (DPR) |
13.1.2 Detailed Incident Report (DIR) |
Administrative revision |
12.3 Emergency Burning or Flaring (PPR) |
13.1.3 Incident Costs |
|
12.4 Hazard Identification (PPR) |
13.2 Near-Miss Reporting (COG–DPR and OG–DPR) |
Administrative revision |
12.5 Suspension of Operations (PPR) |
13.3 Emergency Burning or Flaring (PPR) |
Administrative revision |
12.6 Contravention of DPR–A Reporting (as defined in the DPR–O) |
13.4 Hazard Identification (PPR) |
Administrative revision |
12.6.1 Contravention of DPR–A Preliminary Event Reports |
13.5 Suspension of Operations (PPR) |
Administrative revision |
12.6.2 Contravention of DPR–A Detailed Event Reports |
13.6 Contraventions of DPR–A Reporting and/or Damage to Pipe (DPR–O) |
Administrative revision |
12.7 Damage to Pipe Notification |
13.6.1 Preliminary Event Report (PER) |
Administrative revision |
12.7.1 Damage to Pipe Preliminary Event Reports |
13.6.2 Detailed Event Report (DER) |
Administrative revision |
12.7.2 Detailed Event Reports |
13.7 Suspension of Consent (DPR–O) |
Administrative revision |
12.8 Suspension of Consent (DPR–O) |
13.8 IPLDPR Contravention and/or Damage to Power Lines |
Added IPLDPR reporting requirements |
Appendix 1: Corrective and Preventative Actions |
Appendix 1: Causes, Corrective and Preventive Actions |
Administrative revision |
- Date modified: