Appendix IV

Enbridge Pipelines Inc.

Documents ReviewedFootnote * - Emergency Management Program

Name
2014 Audit IR Response Status Check_041014
2014 Eastern Helicopter Planning Schedule
2014 NEB Audit - All Asset Registry - Eastern Region
2014 NEB Audit - All Asset Registry - EPSI Region
2014 NEB Audit - All Asset Registry - Northern Region
2014 NEB Audit - All Asset Registry - Western Region
2014 NEB Audit - Asset Registry - Central Region
2014 NEB Audit - Central Region Org Chart
2014 NEB Audit - Central Region PSV's
2014 NEB Audit - Central Region Stations and Terminals
2014 NEB Audit - Eastern Region Org Chart
2014 NEB Audit - Pipe Asset Registry - Central Region
2014 NEB Audit - Pipe Asset Registry - Eastern Region
2014 NEB Audit - Pipe Asset Registry - EPSI Region
2014 NEB Audit - Pipe Asset Registry - Northern Region
2014 NEB Audit - Pipe Asset Registry - Western Region
2014 NEB Audit -Eastern Region PSV's
2014 NEB Audit -Eastern Region Stations and Terminals
2014 NEB Audit -EPSI PSV's
2014 NEB Audit -EPSI Region Org Chart
2014 NEB Audit -EPSI Stations and Terminals
2014 NEB Audit -Field Operations Services Org Chart
2014 NEB Audit -Northern Region Org Chart
2014 NEB Audit -Northern Region PSV's
2014 NEB Audit -Northern Region Stations and Terminals
2014 NEB Audit -Northern Region Sump Tanks
2014 NEB Audit -Western Region Org Chart
2014 NEB Audit -Western Region PSV's
2014 NEB Audit -Western Region Stations and Terminals
2014 NEB Audit -Western Region Sump Tanks
2014 NEB Audit_ESM Focus Area _Planning Meeting_vF.3
4.4 GV D Email Management Policy V01
4.4 GV D Records Discovery Policy V01
4.4 GV D Records Management Policy V01
4.4 GV D Records Retention Schedule V01
4.4 GV D Retention Schedule Development Sustainment Standard V01
4.4_GV_Documents and Records Summary
6 4c_2014 Evaluation of Need
6 5 1g and h_Legal Requirements
Att EM 1 - 6.5 1 (a) - Objectives Implemention in Regions
Att EM 2 - Minutes Quarterly ESM Enviro Meeting July 15 2014
Att EM 3 - HSE Support Services Mandate 5 26 14
Att EM 4 - ER Mitigation projects 2012 v1
Att EM 5 - LP Risk Management Dispersion modeling presentation
Att EM 6 - ESM Management of Change Form
Att EM 7 - Screen Shot of ER Plans Change Management Tracking
Att EM 8 - TSB MOC 2014-36 Form
Att EM 9 - 6.5 1 u - EM Program Inspections
Att GV 2 - Inventory of Hazards and Potential Hazards
Att GV 3 - Identifying and Communicating Legal Requirements
Att GV 4 - Field Operations Training Update
Att GV 5 - Interim Training Verification Solution (Electrical Role)
Att GV 6 - Process for Developing Competency and Training Program
Canadian ER Plans (ICP development) Email to Regional Dir V1.0
Central Region Equipment Deployment Feb 26 2014
Central Region Equipment Deployment Jan 18 2014_Redacted
egret-export-2014-08-12_08-43-49-AM(1)
egret-export-2014-08-12_08-44-59-AM(1)
Emergency Management Program - Supplemental Information
Emergency Response and Security Regional 3 Year Plan - 2014
Employee Type by Region
Enbridge Assets by NEB Entity
Enbridge Final Responses to close-out discussion
Enbridge Mainline Patrols_Western, Central and Northern
ER 2 1 Documents and Records Summary
ER 2 1 Response to NEB IR No 1
ER 2 2 Documents and Records Summary
ER 2 2 Response to NEB IR No 1
ER 2.2 D 2013_04_30_ICP_Gap_Analysis RFP_v1_H2Safety
ER 2.2 D Canadian Gap Analysis Summary Tables
ER 2.2 D Enbridge Canadian ER Plan Gap Analysis
ER 2.2 R 2014_04_23_M Uncontrolled Copy of IMS07_vF
ER 2.3 R Emergency and Security Management 2013 Department Plan
ER 2.3 R Emergency and Security Management 2014 Department Plan
ER 3.1 D Control Point Mapping Site Sheet Template_v1
ER 3.1 D Don River Tactical Response Plan V1.0
ER 3.1 D Edmonton Terminal Pre-Fire Plan V1.0
ER 3.1 D Enbridge Inland Tactical Response Guide Draft V0.5
ER 3.1 D EPSI System Pre-Fire Plan V1.0
ER 3.1 D ER Equipment Purchasing Process for Additional ORM Funds_Last Revised April 13th 2012
ER 3.1 D ER Equipment Recommendations_v2
ER 3.1 D Incident Management Handbook V1.0
ER 3.1 D LP Security Management Plan V1.0
ER 3.1 D Maintenance Procedures Management System Document
ER 3.1 D OMM BK 7 Version 11
ER 3.1 D Pipestone Creek Tactical Response Plan V1.0(S)
ER 3.1 D Sarnia Terminal Pre-Fire Plan V1.0
ER 3.1 D St Clair Tactical Response Plan V1.0(S)
ER 3.1 Documents and Records Summary
ER 3.1 R 12.05.08_ ER Equipment Meeting Minutes_vF
ER 3.1 R 12.05.29_ ER Equipment Meeting Minutes_vF
ER 3.1 R 12.06.07_ ER Equipment Meeting Minutes_vF
ER 3.1 R AnnualUpdate Bk7 V10 2013-04-15 MEMO
ER 3.1 R AnnualUpdate Bk7 V11 2013-12-15 MEMO
ER 3.1 R CriticalUpdate Bk7 V9 2012-06-15 Rev12-01 MEMO
ER 3.1 R CriticalUpdate Bk7 V9 2012-11-29 REV12-XX MEMO
ER 3.1 R CriticalUpdate Bk7 V9 2013-12-31 REV12-13 MEMO
ER 3.1 R Emergency Response Advisory Team Meeting Miniutes-June 2013
ER 3.1 R Emergency Response Advisory Team Meeting-Nov12
ER 3.1 R ER Bulletin- 01-2012 Underflow Culvert Weir Dams
ER 3.1 R ER Bulletin- 01-2013 Incident Command Post Kits
ER 3.1 R ER Bulletin- 02-2012 Incident Organization Wall Chart
ER 3.1 R ER Bulletin- 02-2014 CEPA Mutual Aid Agreement
ER 3.1 R ER Bulletin- 03-2013 Integrated Contingency Plan (ICP)
ER 3.1 R ER Bulletin- 05-2013 Wildlife Kits
ER 3.1 R ER Bulletin-ICP Rollout-February 2013 V1.0
ER 3.1 R ER Bulletin-ICS Training, October 2013 V1.0
ER 3.1 R Revision Process At-A-Glance OMM
ER 3.1 R Security Incident Advisory-April 2013 V1.0
ER 3.1 R Security Incident Advisory-Novemeber 2012 V1.0
ER 3.1 R Security Incident Advisory-September 2013 V1.0
ER 3.1 R TRP _Active Status_Distribution List_June 25
ER 3.2 D Book 7 - Part II - Eastern Region
ER 3.2 D Edmonton Terminal Pre-Fire Plan V1.0
ER 3.2 D Enbridge Crisis Management Plan V1.0
ER 3.2 D EPSI System Pre-Fire Plan V1.0
ER 3.2 D ICP DRAFT A1 Eastern Region V1.0
ER 3.2 D ICP DRAFT A2 Eastern Region V1.0
ER 3.2 D ICP DRAFT A3 Eastern Region V1.0
ER 3.2 D ICP DRAFT A4 Eastern Region V1.0
ER 3.2 D ICP DRAFT A5 Eastern Region V1.0
ER 3.2 D ICP DRAFT A6 Eastern Region V1.0
ER 3.2 D ICP DRAFT S1 Eastern Region V1.0
ER 3.2 D ICP DRAFT S2 Eastern Region V1.0
ER 3.2 D ICP DRAFT S3 Eastern Region V1.0
ER 3.2 D ICP DRAFT S4 Eastern Region V1.0
ER 3.2 D Incident Management Handbook V1.0
ER 3.2 D Maintenance Procedures Management System
ER 3.2 D OMM BK 7 Version 11
ER 3.2 R Agenda For Line 9 ERP Project V1.0
ER 3.2 R CAN ICP development timeline 2014 v3
ER 3.2 R Eastern Region ICP Overview L9 V1.0
ER 3.2 R ERATQ4 ICP Meeting Minutes ICP V1.0
ER 3.2 R ICP Kick Off Meeting ERAT Q2 2013 V1.0
ER 3.2 R ICP Update Meeting V1.0
ER 3.2 R ICP Update_ERAT_V1.0
ER 3.4 D B7 01-02-03 Emergency-Security Exercises CAN
ER 3.4 D B7 01-02-04 Emergency Response Training Matrix CAN
ER 3.4 D E SM Course syllabi vf
ER 3.4 D ICS Role Specific Training Material V1.0(S)
ER 3.4 D IMS 07 Emergency and Security Management System V1.0
ER 3.4 R CriticalUpdate_Bk7_V9_2014-05-01_REV14-01_MEMO
ER 3.4 R ICS Position Specfic Handout
ER 3.4 R ICS PRO registration deskdrop 7.5x5 v5
ER 3.4 R OMM NOTIFICATION_CRITICAL UPDATE_Book 7_Emergency Response - CAN
ER 3.5 D B1 03-02-02 Public Awareness Program CAN
ER 3.5 D B7 02-02-06 Public Relations CAN
ER 3.5 D B7 02-02-07 Impacted Landowners-Tenants CAN
ER 3.5 D B7 02-02-08 Emergency Communications CAN
ER 3.5 R ER Bulletin- 01-2012 Underflow Culvert Weir Dams
ER 3.5 R ER Bulletin- 01-2013 Incident Command Post Kits
ER 3.5 R ER Bulletin- 02-2012 Incident Organization Wall Chart
ER 3.5 R ER Bulletin- 02-2014 CEPA Mutual Aid Agreement
ER 3.5 R ER Bulletin- 05-2013 Wildlife Kits
ER 3.5 R ER Bulletin-ICP Rollout-February 2013 V1.0
ER 3.5 R ER Bulletin-ICS Training, October 2013 V1.0
ER 4 1 Documents and Records Summary
ER 4 1 Response to NEB IR No 1
ER 4.1 D 2012_07_23_ER Capability Project Plan_Rev2
ER 4.1 D 2013_04_30_ICP_Gap_Analysis RFP_v1_H2Safety
ER 4.1 D Assessment Checklist
ER 4.1 D Canadian Gap Analysis Summary Tables
ER 4.1 D Enbridge Canadian ER Plan Gap Analysis
ER 4.1 D Enbridge ER Capabilities Assessment Report
ER 4.1 R 2012-11-29 EPI and EPSI Emergency Procedures Manual Review Response
ER 4.1 R 2014 ER Capability Action Plan v2 April Update
ER 4.1 R CRITICAL UPDATE REQUIRED for NEB Self Assessment, Book 7
ER 4.1 R Lakehead plan Department deliverables-2014 update
ER Equipment Check April 2014
ER Equipment Check June July 2014
ER Equipment Check March 2014
ER_2 3_R_Concordance Table - Updated Emergency Management Information
ER_2 3_R_Emergency and Security Management 2014 Work Plan
ER_2.1_D_Book7_02-02-01_Emergency Notification_CAN
ER_2.1_D_Don River Tactical Response Plan_V1.0
ER_2.1_D_Edmonton Terminal Pre-Fire Plan_V1.0
ER_2.1_D_IMS 07 Emergency and Security Management System_V1.0
ER_2.2_D_ 2014_02_10_IMS07 Legal Requirements
ER_2.2_D_Draft Directive 071 letter
ER_2.2_D_Draft Directive 71 Feedback form
ER_2.2_D_IMS 07 Compliance Register_2014_03_14
ER_2.2_Enbridge E2 Submission_FILED April 14
ER_2.2_R_Meeting 1 - Directive 071 - 7 Jan 2013
ER_2.2_R_Meeting 1 - E2 Consultation Kickoff - 13 Dec 2013
ER_2.2_R_Meeting 2 - E2 - Placeholder to further discuss (TBD 23 Jan 2014)
ER_2.2_R_Meeting 2- Directive 071 - 9 Jan 2013
ER_2.2_R_Meeting 3- Directive 071 - 10 Jan 2013
ER_2.2_R_PREP Guidelines meeting minutes 041114
ER_2.2_R_PREP Guidelines meeting minutes 042414
ER_2.3_R_2013 Dept Plan Emergency and Security Management_V1 0
ER_2.3_R_Emergency and Security Management 2014 Work Plan
ER_2.3_R_Emergency and Security Management 2014 Work Plan Other Initiatives
ER_2.4_D_2013 E3RT Terms of Reference - VER_4
ER_2.4_D_ERAT Terms of Reference_V1.0
ER_2.4_D_JBUCERC Terms of Reference_V1.0
ER_2.4_R_11.11.29 ERAT Meeting Minutes_V1.0
ER_2.4_R_11.11.29_ERAT Agenda
ER_2.4_R_12.11.28 ERAT Meeting Minutes_V1.0
ER_2.4_R_12.11.28_ERAT Action Items
ER_2.4_R_12.11.28_ERAT Agenda
ER_2.4_R_13.06.18 ERAT Meeting Minutes_V1.0
ER_2.4_R_13.06.18_ERAT Agenda
ER_2.4_R_2013_03_05_ ERAT Meeting Minutes_V1.0
ER_2.4_R_2013_03_05_ERAT Agenda Mar 5_6 2013
ER_2.4_R_2013_09_19_Action Items_ERAT_Sept2013_EM_JM_v01
ER_2.4_R_2013_09_19_Minutes_ERAT Sept2013_EM_JM_v01
ER_2.4_R_2014 Job Profile - Emergency Management Systems Specialist
ER_2.4_R_2014 Position Approval Request Form - EM Systems Specialist
ER_2.4_R_ER Steering committee Minutes Aug 3 2011_V1.0
ER_2.4_R_ERAT - NEB Audit Record
ER_2.4_R_JBUCERC Apr 23 2014 Agenda
ER_2.4_R_JBUCERC EM Metrics
ER_2.4_R_JBUCERC Q12014 Meeting Minutesv4
ER_2.4_R_JBUCERC Q22014 Meeting Minutesv1
ER_2.4_R_Position Request for Review - EM Systems Specialist
ER_3.1_D_Guide A - All Construction Projects_V01
ER_3.1_D_Guide B - Changes to Tankage or Product_v01
ER_3.1_D_Guide C - Changes to Facility New or Existing_v1
ER_3.1_D_Guide D - Changes to Pipeline New or Existing_v1
ER_3.1_D_IMS 07 Emergency and Security Management System
ER_3.1_D_LP PIPEM - PIPEM Checklist - v1
ER_3.1_D_LP Project Integration Program for Emergency Management Standard
ER_3.1_D_PIPEM Update Form_v1
ER_3.1_D_PIPEM Workflow 001 - ESM Contact - Under Revision
ER_3.1_D_PIPEM Workflow 002 - Project Contact
ER_3.1_D_PIPEM Workflow 003 - Regional Contact
ER_3.1_IMS-01 Governing Policies and Process
ER_3.1_R_PIPEM Checklist for South Edmonton Terminal Step 1 and 2 - DRAFT
ER_3.1_R_TRP _Active Status_Distribution List_V1.0
ER_3.1_Response to NEB IR No 1
ER_3.2_D_Don River Tactical Response Plan_V1.0
ER_3.2_D_Pipestone Creek Tactical Response Plan_V1.0
ER_3.2_D_Sarnia Terminal Pre-Fire Plan_V1.0
ER_3.2_Documents and Records Summary
ER_3.2_R_Control Point Map Example
ER_3.2_R_CPM Data Sheet Sample
ER_3.2_Response to NEB IR No 1
ER_3.3_D_PIPEM Communications and Training Plan Revision 3
ER_3.3_D_PIPEM Guidelines 001 - ESM Contact - Under Revision
ER_3.3_D_PIPEM Guidelines 002 - Project Contact
ER_3.3_D_PIPEM Guidelines 003 - Regional Contact
ER_3.3_R_ER Bulletin-03-2014 PIPEM_v01
ER_3.3_R_Meeting Notice - MP Focus Group in PIPEM Development_V01
ER_3.3_R_Meeting Notice - MP General Awareness Session_V01
ER_3.3_R_Meeting Notice - MP Kickoff
ER_3.3_R_Meeting NOtice - MP Project Contact Training_V01
ER_3.3_R_Meeting Notice - Project Contact Q&A 1
ER_3.3_R_Meeting Notice - Project Contact Q&A 2
ER_3.3_R_Meeting Notice - Regional Contact Awareness and Training Session Central_V01
ER_3.3_R_Meeting Notice - Senior Management Approval of PIPEM
ER_3.3_R_Meeting Notice - Stakeholder Engagement Compliance
ER_3.3_R_Meeting Notice - Stakeholder Engagement Environment
ER_3.3_R_Meeting Notice - Stakeholder Engagement ESM
ER_3.3_R_Meeting Notice - Stakeholder Engagement Risk
ER_3.3_R_PIPEM Quick Reference Card (11x17-Print and Fold)
ER_3.4_D_Emergency and Security Management Exercise Design Guide
ER_3.4_Document and Record Summary
ER_3.4_R_elms ICS 100200 Report 2011-2014_V1.0
ER_3.4_R_TRAC CAN Western Tank Fire Report_V1.0
ER_3.4_R_TRG ICS School Letter_V1.0
ER_3.4_Response to NEB IR No 1
ER_3.5_Documents and Records Summary
ER_3.5_Response to NEB IR No 1
ER_3.6_D_Governance Document Library - Guidance Notes for ESM_V1.0
ER_3.6_R_ER Bulletin-05-2014 GDL_V1.0
ER_4.1_D_AAM Instructions_vF
ER_4.1_D_AAR-IP Agenda
ER_4.1_D_Enbridge Exercise Evaluation Guide
ER_4.1_D_Exercise_AAR_Template_vF
ER_4.1_D_Hot Wash Agenda
ER_4.1_D_Incident_AAR_Template_vF
ER_4.1_D_Participant Feedback Form
ER_4.1_IMS 07 Emergency and Security Management System_V1.0
ER_D_IMS 07 Emergency and Security Management System_V1.0
ex and trg concept
Final Report -Emergency Excavation Table Top - March 18 2014
GV 1 2 Documents and Records Summary
GV 1.2 D IMS 01 Governing Policies and Processes
GV 1.2 Response to NEB IR No 1
GV 2 3 Response to NEB IR No 1
GV 2.1 D IMS-01 Governing Policies and Processes V1.0
GV 2.1 D LP Mainline Risk Modeling Presentation - 3-28-2014
GV 2.1 Documents and Records Summary
GV 2.1 Response to NEB IR No 1
GV 2.2 D IMS-01 Governing Policies and Processes V1.0
GV 2.2 D IMS-02 Compliance and Ethics Management System V1.0
GV 2.2 Documents and Records Summary
GV 2.2 R Legal Updates elink page V1.0
GV 2.3 D IMS-01 Governing Policies Processes
GV 2.4 Document and Records Summary
GV 2.4 Response to NEB IR No. 1
GV 3 3 Response to NEB IR No 1
GV 3 5 Response to NEB IR No 1
GV 3.3 D OMS Appendix IV Change Management Process V01
GV 3.3 D OMS Operating-Maintenance Procedures Management Standard Document V01
GV 3.3 D OMS Operating-Maintenance Procedures Management System Document V01
GV 3.3 R CriticalUpdate Bk7 V9 2013-12-31 REV12-13 MEMO V01
GV 3.3 R Deviation B3 06-03-20 CAN 2012-09-14 V01
GV 3.4 HR - Response to NEB IR No. 1
GV 3.4 HR Documents and Records Summary
GV 3.4 OPS - Documents and Record Metadata Table
GV 3.4 OPS - Response to NEB IR No. 1
GV 3.5 Documents and Records Summary
GV 3.6 D Document Owner-Stakeholder List V01
GV 3.6 R Annual Review Schedule V01
GV 3.6 R Annual Update Bk7 V9 2011-12-01 MEMO V01
GV 3.6 R BOOK 7 Change Markups 2013-12-15 V01
GV 3.6 R CriticalUpdate Bk7 V9 2013-12-31 REV12-13 MEMO V01
GV 3.6 R FORM-B0-D-001_DEVIATION REQUEST FORM
GV 3.6 Response to NEB IR No 1
GV 4 1 Response to NEB IR No 1
GV 4.1 D IMS 01 Governing Policies and Processes
GV 4.3 D 1. Cover
GV 4.3 D 2. Table of Contents
GV 4.3 D Chapter 1 Who We Are
GV 4.3 D Chapter 2 Introduction to Paisley GRC
GV 4.3 D Chapter 3 Audit Plan Development
GV 4.3 D Chapter 4 Audit Planning Engagement Phase
GV 4.3 D Chapter 5 Audit Program and Fieldwork
GV 4.3 D Chapter 6 Document Review and Approval
GV 4.3 D Chapter 7 Audit Report and Close
GV 4.3 D Chapter 8 Condition Tracking and Action Plans
GV 4.3 D Chapter 9 Time Reporting and Audit Administration
GV 4.3 D IMS 01 Governing Policies and Processes
GV 4.3 D PC-1001 Internal Stakeholder Department Reviews Procedure
GV 4.3 D PC-1003 Integrated Review Practice
GV 5 0 Document and Record Summary
GV 5 0 Response to NEB IR No 1
GV 5.0 D IMS 01 Governing Policies and Processes
GV_1. 1_Documents and Records Summary
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Bakken Pipeline Company Inc
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Inc
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Pipelines (NW) Inc
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Pipelines (Westspur)
GV_1.1_R_2014 03 31 Letter to NEB Accountable Officer - Enbridge Southern Lights
GV_1.1_Response to NEB IR No 1
GV_1.2_D_ IMS 07 Emergency and Security Managemen tSystem V1.0
GV_1.2_D_IMS-04 Occupational Health and Safety Management System_V01
GV_1.2_D_LP Scorecard 2013 Nov 13_Redacted
GV_1.2_D_PIMS (IMS-09) Framework_V01
GV_1.2_R_Compliance Policy
GV_1.2_R_LP Scorecard 2013 Nov 13_Redacted
GV_1.2_R_Statement on Business Conduct
GV_2.1_D_Department Risk Management Process Description
GV_2.1_D_Department Risk Management Process Map
GV_2.1_D_High Consequence Area Definitions (March 3rd 2011)
GV_2.1_D_LP Risk Report Management Process Description
GV_2.1_D_LP Risk Report Management Process Map
GV_2.1_D_Risk Management Policy
GV_2.1_D_Risk Management Processes
GV_2.1_R_Liquid Facility Risk Assessment Model Weightings 2011-2012
GV_2.1_R_ORM Risk Model
GV_2.2_Response to NEB IR No 1
GV_2.3_D_Field Operations Department Plan
GV_2.3_Documents and Records Summary
GV_2.4_D_10.2 HR_WFP Procedure Manual_V01
GV_2.4_D_10.3 HR_WFP Quick Reference Guide_V01
GV_2.4_D_10.4 HR_WFP FAQ_V01
GV_2.4_R_ Position_Description Template _V01
GV_2.4_R_10.13 HR_ Job Ladders for Govt and Public Affairs _V01
GV_3 6_Documents and Records Summary
GV_3.3_D_B1_06-02-01
GV_3.3_D_FORM-B0-D-001_DEVIATION REQUEST FORM
GV_3.3_D_IMS 01 Governing Policies and Processes
GV_3.3_Documents and Records Summary
GV_3.4_D_Appendix 1 - Training Matrices
GV_3.4_D_Appendix 2 - TRAC Syllabus 2013
GV_3.4_D_Appendix 3 - Health and Safety Forms
GV_3.4_D_Current State Report 051214
GV_3.4_D_HR 1Content Development - Content Build (Mar 30)_V01
GV_3.4_D_HR 20120914 ALD Governance Structure_V01
GV_3.4_D_HR Administrator - Resources_V01
GV_3.4_D_HR eLMS Client Orientation_2013_V01
GV_3.4_D_HR eLMS Roles and Responsibilities_V01
GV_3.4_D_HR ENBU Guiding Principles_V01
GV_3.4_D_HR End User - Job Aids List_V01
GV_3.4_D_HR IDP FAQ 2014 2_V01
GV_3.4_D_HR IDP Instructions 2_V01
GV_3.4_D_HR Individual Contributor Competencies GT_V01
GV_3.4_D_HR LD Competency Framework Process_V01
GV_3.4_D_HR LDRSHIP Dev Framework 3_V01
GV_3.4_D_HR Manager - Job Aids List_V01
GV_3.4_D_HR What Makes an Individual Development Plan IDP Rev 2_V01
GV_3.4_D_OPS Competency Matrix V01
GV_3.4_D_OPS Matrix Verification Report V01
GV_3.4_D_OPS Tech Training Mgmnt System V01
GV_3.4_R_Record - Forecast Report
GV_3.4_R_Record - Metrics
GV_3.4_R_Record - Operations Competency
GV_3.4_R_Record - PLM Test - Matrix verification
GV_3.4_R_Record - PLM Test - Student all Report
GV_3.4_R_Record - Supervisor Report
GV_3.4_R_Record - TRAC - Quick Ref Card
GV_3.4_R_Record - TRAC Screen
GV_3.4_R_Record - Training Completion
GV_3.5_D_IMS 04 Occupational Health and Safety Management System
GV_3.5_D_IMS 06 Environmental Management System
GV_3.5_D_IMS 07 Emergency and Security Management System
GV_3.5_R_Operational Reliability Review Nov 26
GV_3.6_D_Documents Policy
GV_3.6_D_Governance Documents Library How To
GV_3.6_D_IMS 02 Compliance and Ethics_V01
GV_3.6_D_OMS_Operating-Maintenance Procedures Management Standard Document_V01
GV_3.6_D_Procedure Library Processes
GV_3.6_R_Governance Documents Library Communication
GV_3.6_R_Governance Documents Library FAQs
GV_3.6_R_Procedure Library Communication
GV_4 2_D_B1_02-02-01_rev12
GV_4 3_Documents and Records Summary
GV_4.1_Documents and Records Summary
GV_4.3_Response to NEB IR No 1
GV_4.4_Response to NEB IR No 1
IR on training-9 May (v1)
Letter to NEB Auditors re Treament of Documentation - Mar 25 2014
Line Summary Maps - 2013
Major Outage Coodination Upstream Downstream Lines
Major Outage Coordination Downstream Lines(April 09 2014) NEB-regulated1
Major Outage Coordination Upstream Lines (April 09, 2014) NEB-regulated1
March 18 2014 - Excavation Table Top Lessons Learned
Mentee List- Central
Mentee List-Eastern Region
Mentee List-Enbridge Sask
Mentee List-Northern Region
Minutes March 18 2014 - Table Top Exercise_Redacted
NEB Audit Governance Level May Schedule
NEB Audit Governance Level May Schedule
NEB Org chart CR all v2
NEB Org chart EPSI all v2
NEB Org chart.ER.all
NEB Org chart.NR.all
NEB Org chart.WR.all
NEB Regulated Pressure Vessels - Shipped Product Only
NEB tanks 2014 and OOS inspections planned Rev1
Project Integration Slides
Registry_Inventory
response_6 31b_Goals Objectives for Emergency Response
Risk Register - Emergency Security Mgmt v1.11 - Audit Copy
RP_System Capacity_Rev1
Third Party Consulting Service Requisition Form
TRAC Syllabi V01
Western Region ER Records
YP Ice Deployment Exercise - Mar 11 2014