ARCHIVED - Enbridge Pipeline Inc. (Enbridge) Control Center Operation Compliance Verification - Erratum
This page has been archived on the Web
Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.
Enbridge Pipeline Inc. - Control Centre Operation Compliance Verification - Erratum [PDF 64 KB]
Files OF-Surv-Fins-E101 2011
OF-Surv-Gen 07
17 June 2013
Mr. Stephen Wuori
President, Liquids Pipelines and Major Projects
Enbridge Pipeline Inc.
3000 Fifth Avenue Place
425 – 1st Street S.W.
Calgary, AB T2P 3L8
Facsimile 403-231-5710
Dear Mr. Wuori:
Enbridge Pipeline Inc. (Enbridge) Control Centre Operation Compliance Verification
The Board wishes to clarify the effective date of Safety Order SO-E101-003-2013 and has therefore amended the Order, specifying that the date of the Order is the date of its issuance which is 10 June 2013. Please find attached Amending Order AO-001-SO-E101-003-2013.
Yours Truly,
Sheri Young
Secretary of the Board
c.c. Ms. Bonnie Andriachuk, Sr. Director, Risk, Compliance and Integrated Management, facsimile 780-420-8177
ORDER AO-001-SO-E101-003-2013
IN THE MATTER OF the National Energy Board Act (the Act) and the regulations made thereunder; and
IN THE MATTER OF section 21 of the Act, National Energy Board File OF-Surv-Gen 07.
BEFORE the Board on 17 June 2013.
WHEREAS the Board has issued Order SO-E101-003-2013 (the Order) requiring specific safety and security measures of Enbridge;
AND WHEREAS the Board wishes to clarify that the effective date of the Order is 10 June 2013, the date of its issuance;
IT IS ORDERED THAT pursuant to subsection 21(1) of the Act, the Order is amended by adding "Issued 10 June 2013" following Condition 3.6.
This Amending Order shall come into effect on 17 June 2013.
NATIONAL ENERGY BOARD
Sheri Young
Secretary of the Board
- Date modified: