Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC – Order LH-001-2020
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator InspectionOfficer hereby notifies:
Trans Mountain Pipeline ULC
that the hazardous or detrimental situation described in Order No. LH-001-2020 has been remedied to the satisfaction of the Inspection Officer.
Therefore,
- X suspended work may resume, and/or
- X the measures specified in the order have been satisfied.
Inspection Officer | |||
---|---|---|---|
Name | IO Designation # | Telephone | |
5 January 2021 | Signature |
||
Date | |||
210-517 10 Ave SW, Calgary AB T2R 0A8 |
CVA or Incident #: CV2021-201
- Date modified: