Notice to Resume Work or of Measures Satisfied – Trans Mountain Pipeline ULC – Order AML-001-2023
NOTICE TO RESUME WORK OR OF MEASURES SATISFIED
IN THE MATTER OF THE CANADIAN ENERGY REGULATOR ACT,
FOLLOWING AN ORDER UNDER SECTION 109(1)
The undersigned Canada Energy Regulator Inspection Officer hereby notifies Trans Mountain Pipeline ULC that the hazardous or detrimental situation described in Order No. AML-001-2023 has been fully remedied to the satisfaction of the Inspection Officer.
Therefore,
- suspended or stopped work may resume
- X the measures specified in the Order have been satisfied
Inspection Officer |
24 October 2023 |
|
---|---|---|
Date |
Name |
|
IO Designation Number |
Signature |
|
210-517 10 Ave SW, Calgary AB T2R 0A8 |
CVA number: CV2223-314
- Date modified: