Archived public documents
Below are archived public documents that were posted to our website for hearings held about major applications in the North and offshore or large reviews. They are available so that anyone, the public or those involved in the hearing at the time, can view them. Having them publicly available helped those involved in the review respond and assisted those tasked with making decisions.
On this page
- Arctic offshore drilling review
- Exploration drilling
- Last marine seismic authorization: 2011 Northeastern Canada 2D Marine Seismic
Arctic offshore drilling review
In response to the disaster in the Gulf of Mexico, the NEB initiated a review of the safety and environmental requirements for offshore drilling in Canada's unique Arctic environment.
Through the Arctic Offshore Drilling Review, the NEB examined the best information available on the hazards, risks and safety measures associated with offshore drilling in the Canadian Arctic. The Board invited those with an interest in these topics, including Northern residents, scientists, other regulators, representatives of environmental non-government organizations and industry, to share their information and knowledge.
At the end of the Arctic Offshore Drilling Review, the Board prepared a report on safety and environmental protection requirements for offshore drilling in the Canadian Arctic. The NEB will use the results of the review to inform its decisions on future applications for offshore drilling in the Arctic.
In 2010, the National Energy Board (now the CER) initiated a review into drilling in the arctic offshore and whether major incidents, such as the Deep Water Horizon accident, could also happen here. The review was called the Arctic Offshore Drilling Review. Later, in 2016, Canadian Arctic waters were designated as off limits to future oil and gas licensing.
Filing requirements specific to offshore drilling in the Canadian Arctic were also put in place as a result of the review. Find out more about the review and what we expect for companies drilling offshore.
- Final report: Review of offshore drilling in the Canadian Arctic
- Backgrounder: National Energy Board Report on the Arctic Offshore Drilling Review – Read the translations (Gwich'in, Innuinnaqtun, Inuvialuktun and Inuktitut) [Filing A37753]
- Scope: Public Review of Arctic Safety and Environmental Offshore Drilling Requirements Scope [Filing A26409]
View other documents related to the arctic offshore drilling review, such as expert reports and letters of comments, in our online database REGDOCS
- REGDOCS: Arctic offshore drilling review [Folder 621169]
- Transcripts – Public review of Arctic safety and environmental offshore drilling requirements
- 16 September 2011 [Filing A31498]
- 15 September 2011 [Filing A31459]
- 14 September 2011 [Filing A31414]
- 13 September 2011 [Filing A31371]
- 12 September 2011 [Filing A31308]
Inuvik rountable
- Questions and answers – Inuvik Roundtable
- 2011-09-08 Inuvik Roundtable Meeting – Agenda [Filing A31180]
- 2011-07-05
Process Update for the Inuvik Roundtable Meeting [Filing A29992] - 2011-07-05
Process Update and Agenda for the Inuvik Roundtable Meeting – Arctic Review [Filing A29992]
Meeting summaries
- 2010-11-24
National Energy Board, Northwest Territories Premier, The Honourable Floyd Roland and The Honourable Robert McLeod, Minister of Industry, Tourism and Investment
Yellowknife, NT - National Energy Board Introduces the Arctic Offshore Drilling Review to Nellie Cournoyea and the Inuvialuit Regional Corporation Board Members, and officially initiates Phase one activities in the Inuvialuit Settlement Region
Inuvik, NT - 2010-11-25
National Energy Board introduces the Arctic Offshore Drilling Review to the Nihtat Gwich'in Tribal Council Members, and officially initiate Phase one activities in the Gwich'in Settlement Area
Inuvik, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the Mayor of Inuvik and officially initiates Phase one activities in Inuvik
Inuvik, NT - 2010-12-02
National Energy Board and John Ondrack, Chair of the Inuvialuit Environmental Impact Screening Committee
Calgary, AB - 2010-12-06
National Energy Board Introduces the Arctic Offshore Drilling Review to the Northwest Territories Wildlife Management Advisory Council
Inuvik, NT - 2010-12-07
National Energy Board Introduces the Arctic Offshore Drilling Review to the Inuvialuit Game Council
Inuvik, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the President of the Gwich'in Tribal Council
Inuvik, NT - 2010-12-08
National Energy Board Introduces the Arctic Offshore Drilling Review to students at Samuel Hearne Secondary School
Inuvik, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the Wildlife Management Advisory Council (North Slope)
Inuvik, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the Natural Resources Technology Program students at Aurora College
Inuvik, NT - 2011-01-17
National Energy Board Introduces the Arctic Offshore Drilling Review to the Fisheries Joint Management Committee
Winnipeg, MB - 2011-01-19
National Energy Board Introduces the Arctic Offshore Drilling Review to the Inuvik Hunters & Trappers Committee and the Community Corporation Members
Inuvik, NT - 2011-01-20
National Energy Board Introduces the Arctic Offshore Drilling Review to the students of Moose Kerr School
Aklavik, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the Ehdiitat Gwich'in Council
Aklavik, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the residents of Inuvik
Inuvik, NT - 2011-01-21
National Energy Board holds workshop meeting on the Arctic Offshore Drilling Review with the Aklavik Hunters & Trappers Committee and the Community Corporation Members
Aklavik, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the residents of Aklavik
Aklavik, NT - 2011-01-24
National Energy Board Introduces the Arctic Offshore Drilling Review to the students of Mangilaluk School
Tuktoyaktuk, NT
National Energy Board holds workshop meeting on the Arctic Offshore Drilling Review with the Tuktoyaktuk Hunters & Trappers Committee and the Community Corporation Members
Tuktoyaktuk, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the residents of Tuktoyaktuk
Tuktoyaktuk, NT - 2011-01-25
National Energy Board Introduces the Arctic Offshore Drilling Review to the students of Angik School
Paulatuk, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the Paulatuk Hunters & Trappers Committee and the Community Corporation Members and Elders
Paulatuk, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the residents of Paulatuk
Paulatuk, NT - 2011-01-26
National Energy Board Introduces the Arctic Offshore Drilling Review to the students of Helen Kalvak School
Ulukhaktok, NT
National Energy Board holds workshop meeting on the Arctic Offshore Drilling Review with the Ulukhaktok Hunters & Trappers Committee and the Community Corporation Members
Ulukhaktok, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the residents of Ulukhaktok
Ulukhaktok, NT - 2011-01-27
National Energy Board Introduces the Arctic Offshore Drilling Review to the principal and teachers of Inualthuyak School
Sachs Harbour, NT
National Energy Board Introduces the Arctic Offshore Drilling Review with to the Sachs Harbour Hunters & Trappers Committee and the Community Corporation Members
Sachs Harbour , NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the residents of Sachs Harbour
Sachs Harbour, NT - 2011-01-28
National Energy Board Introduces the Arctic Offshore Drilling Review to the Inuvialuit Environmental Impact Review Screening Committee (EISC)
Inuvik, NT - 2011-02-09
National Energy Board Introduces the Arctic Offshore Drilling Review to the Yukon Environmental and Socio-Economic Assessment Board
Whitehorse, YK - 2011-02-10
National Energy Board Introduces the Arctic Offshore Drilling Review to the Government of Yukon
Whitehorse, YK - 2011-02-16
National Energy Board Introduces the Arctic Offshore Drilling Review to the Nunavut Impact Review Board and Nunavut Water Board
Yellowknife, NT
National Energy Board Introduces the Arctic Offshore Drilling Review to the Government of the Northwest Territories Staff
Yellowknife, NT - 2011-05-16
Phase 2 Information Meeting
Inuvik, NT - 2011-05-17
Phase 2 Information Meeting
Inuvik, NT - 2011-05-19
Phase 2 Information Meeting
Whitehorse, YK - 2011-05-31
Phase 2 Information Meeting
Students and teachers of Inukshuk High School
Iqaluit, Nunavut - 2011-05-31
Phase 2 Information Meeting
Iqaluit, Nunavut - 2011-06-02
Phase 2 Information Meeting
Yellowknife, NT - 2011-06-28
Phase 2 Information Meeting
Pond Inlet, Nunavut - 2011-06-28
Introduce the Arctic Offshore Drilling Review to the staff of the Nunavut Wildlife Management Board Iqaluit, NU - 2011-06-29
Phase 2 Information Meeting
Clyde River, Nunavut - 2011-06-29
Introduce the Arctic Offshore Drilling Review to the Premier of Nunavut
Iqaluit, NU - 2011-06-29
Provide an update on the Arctic Offshore Drilling Review to the Qikiqtani Inuit Association (QIA)
Iqaluit, NU - 2011-06-29
Provide an update on the Arctic Offshore Drilling Review to the staff of Nunavut Tunngavik Inc. (NTI)
Iqaluit, NU - 2011-07-11
Phase 2 Information Meeting
Aklavik, NT - 2011-07-12
Phase 2 Information Meeting
Tuktoyaktuk, NT - 2011-07-13
Phase 2 Information Meeting
Paulatuk, NT - 2011-07-14
Phase 2 Information Meeting
Ulukhaktok, NT - 2011-07-15
Phase 2 Information Meeting
Sachs Harbour, NT - 2011-07-21
Provide an update on the Arctic Offshore Drilling Review to the Minister of Economic Development and Transportation, Government of Nunavut
Calgary, AB
Background information or historical references
Background
- 2010-12-22
Public Review of Arctic Safety and Environmental Offshore Drilling Requirements – Backgrounder, Regulation of Offshore Drilling in the Canadian Arctic [Filing A27782] - 2010-11-02
House of Commons Standing Committee on Natural Resources – Opening Statement by the National Energy Board – Gaétan Caron - 2010-09-20
Backgrounder – Financial Responsibility and Liability [Document A1U6Y1] - 2010-06-22
Canadian offshore oil/gas exploration and drilling: the current status of operations/applicable regulatory rules and regulations – Senate Committee on Energy, the Environment and Natural Resources – Gaétan Caron - 2010-05-13
National Energy Board's Appearance before the Standing Committee on Natural Resources – Emergency Response to Offshore Oil and Gas Drilling – Opening Statement – Gaétan Caron - 2009
All Regulatory Documents under: Advisory, Same Season Relief Well – MH-1-2010 [Folder 589151] - 2004-09-04
Evaluation of Shear Ram Capabilities – Bureau of Ocean Energy Management, Regulation and Enforcement - 2008-04
Beaufort Sea Strategic Regional Plan of Action – Beaufort Sea Strategic Regional Plan of Action Steering Committee - 2009
Arctic Offshore Oil and Gas Guidelines – Arctic Council - 2009
Barents 2020: Assessment of International Standards for Safe Exploration, Production and Transportation of Oil and Gas in the Barents Sea – DNV - 2010-04-21
Environmental Risk Assessment of Exploration Drilling in Nordland VI – Det Norske Veritas - 2010-08-24
Key Aspects of an Effective US Offshore Safety Regime – DNV - 2010-09-07
US and Norway: Fundamental differences between drilling regimes – DNV - 2010-11
OIL SPILL PREVENTION and RESPONSE IN THE U.S. ARCTIC OCEAN: Unexamined Risks, Unacceptable Consequences – Pew Environment Group - 2010-11
Beaufort Sea Oil Spills State of Knowledge Review and Identification of Key Issues – Environmental Studies Research Funds - 2010-12
ISO 19906:2010 – Petroleum and natural gas industries – Arctic offshore structures – International Organization for Standardization (ISO) - 2010-12-01
Health, Safety and Environmental Case Guidelines for Mobile Offshore Drilling Units – International Association of Drilling Contractors - 2010-12-14
UK Deepwater Drilling – Implications of the Gulf of Mexico Oil Spill - 2011-03-31
Beaufort Regional Environmental Assessment Data Mining Project – ArcticNet Inc. - 2011-05-12
Nuuk Declaration – The Arctic Council - 2011-05-31
National Energy Board Staff Observations of the Cairn Energy Drilling Program – Disko West Offshore Greenland – Sigguk Block [Filing A29471] - 2011-06-23
Comparing the Offshore Drilling Regulatory Regimes of the Canadian Arctic, the U.S., the U.K., Greenland and Norway – The Pembina Institute
Historical References
Process updates
- 2011-04-14
NEB releases a process update for including dates and locations for Information Meeting and Inuvik Roundtable Meeting [Filing A28810] - 2011-02-28
National Energy Board releases process updates and list of contracted studies for the Arctic Offshore Drilling Review [Filing A28359] - 2010-11-23
National Energy Board Call for Information – Requests for Extension [Filing A27392]- National Energy Board Releases Second Call for Information for the Arctic Offshore Drilling Review [Filing A27391]
- 2010-10-27
Process Update for Phases 1 and 2 [Filing A27013] - 2010-09-30
National Energy Board releases first Call for Information for the Arctic Offshore Drilling Review [Filing A26558]
Other reviews, inquiries, or investigations
Other offshore drilling reviews
- 2010-12
Review of Offshore Oil-spill Prevention and Remediation Requirements and Practices in Newfoundland and Labrador – Captain Mark Turner - 2011-05
International Recommendations on Well Incident Prevention, Intervention and Response – AInternational Association of Oil and Gas Producers - 2011-05
Deepwater Wells: Lessons and Recommendations – International Association of Oil and Gas Producers - 2011-05
Capping and Containment – International Association of Oil and Gas Producers - 2011-05
Oil Spill Response – International Association of Oil and Gas Producers - 2011-06-23
An Evaluation of the Science Needs to Inform Decisions on Outer Continental Shelf Energy Development in the Chukchi and Beaufort Seas, Alaska – U.S. Geological Survey
Montara Inquiry
- 2010-06-17
Report of the Montara Commission of Inquiry – Montara Commission of Inquiry - 2010-11-25
Draft Government Response to the Report of the Montara Commission of Inquiry – Australian Government
Macondo/Deepwater Horizon Investigation
- 2011-01
Report to the President: US Government's National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling - 2011-02-17
Macondo – The Gulf Oil Disaster: Chief Counsel's Report - 2011-03-01
Final Report on the Investigation of the Macondo Well Blowout – Deepwater Horizon Study Group - 2011-03-07
Liability and Compensation Requirements Under the Oil Pollution Act – National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling - 2011-03-07
Continuous Improvement is Essential: Leveraging Global Data and Consistent Standards for Safe Offshore Operations – National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling - 2011-03-20
Forensic Examination of Deepwater Horizon Blowout Preventer – DNV - 2011-04-22
Report of Investigation into the Circumstances Surrounding the Explosion, Fire, Sinking and Loss of Eleven Crew Members Aboard the MOBILE OFFSHORE DRILLING UNIT DEEPWATER HORIZON In the GULF OF MEXICO April 20-22, 2010 – Volume 1 – United States Coast Guard - 2011-04-30
Addendum to Forensic Examination of Deepwater Horizon Blowout Preventer – DNV - 2011-06-22
Macondo Well Incident – Transocean Internal Investigation - 2010-09-01
Deepwater Horizon Containment and Response: Harnessing Capabilities and Lessons Learned – BP - 2010-09-08
Deepwater Horizon Accident Investigation Report – BP Investigation Team - 2010-11-16
Interim Report on Causes of the Deepwater Horizon Oil Rig Blowout and Ways to Prevent Such Events – National Academy of Engineering and National Research Council
Canada-Newfoundland and Labrador Offshore Petroleum Board Cougar Helicopter Crash Inquiry
- 2011-07-19
Expert Report prepared by SL Ross Environmental Research Limited – Spill Response Gap Study for the Canadian Beaufort Sea and the Canadian Beaufort Sea and Davis Strait [Filing A30372] - 2010-11-17
Canada-Newfoundland and Labrador Offshore Petroleum Board Helicopter Safety Inquiry Reports
Exploration drilling
These are some of the past major applications we’ve seen for exploration drilling in the North and offshore.
NEB sponsored studies
- 2011-07-19
Expert Report prepared by SL Ross Environmental Research Limited – Spill Response Gap Study for the Canadian Beaufort Sea and the Canadian Beaufort Sea and Davis Strait [Filing A30372] - 2011-07-06
Expert Report – Major Hazard Incidents Prepared by Det Norske Veritas (DNV) [Filing A30021]
ConocoPhillips (Tulita Area, Northwest Territories)
The application from ConocoPhillips Canada Resources Corp. was authorized and work completed. The area is now under jurisdiction of the Office of the Regulator of Oil and Gas Operations in the Northwest Territories
- 2013-10-30
ConocoPhillips Canada Resources Corp.
Operations Authorization 2013 EL 470 Exploration Drilling Program in the Tulita Area, NWT
Same Season Relief Well Technical Proceeding
The other two are submissions for the Same Season Relief Well Technical Proceeding. We ended that proceeding in May 2010 shortly after a serious incident in the Gulf of Mexico. We instead launched a review of offshore drilling in the Arctic, called the Arctic Offshore Drilling Review.
- Chevron Canada Limited – Exploration License EL 481 – Same Season Relief Well Technical Proceeding
- Imperial Oil Resources Ventures Limited – Beaufort Sea Exploration Joint Venture Drilling Program
Last marine seismic authorization: 2011 Northeastern Canada 2D Marine Seismic
This particular project originally triggered an environmental assessment under the Canadian Environmental Assessment Act in 2011. However, it did not trigger an environmental assessment under the Canadian Environmental Assessment Act, 2012 (CEAA 2012). Therefore, information on environmental aspects would not have continued to be added to the CEAA Public Registry. However, we still wanted the information available publicly. Decisions made regarding the project were also later challenged in court and heard by the Supreme Court of Canada.
- 2014-06-26
TGS-NOPEC Geophysical Company ASA, Petroleum GeoServices and Multi Klient Invest AS
Geophysical Operations Authorization Letter with Terms and Conditions - Canada Oil and Gas Operations Act (COGOA) Environmental Assessment Report for the NORTHEASTERN CANADA 2D SEISMIC SURVEY (Baffin Bay/Davis Strait)
Below are lists of documents related to the review of the application and are also available publicly. The National Energy Board (now the Canadian Energy Regulator) is bound by the Official Languages Act and relevant Treasury Board policies. However, some material originates with organizations not subject to the Official Languages Act and is made available on this site in the language in which it was written.
Frequently asked questions
National Energy Board
- 2014-12-19
18 December 2014: Request for a change to the proposed commencement and completion dates of the Geophysical Operations Authorization (GOA) issued on 26 June 2014 - 2014-08-15
Frequently Asked Questions: NEB approval of a 2D offshore seismic survey program in Baffin Bay and Davis Strait - 2014-06-26
TGS-NOPEC Geophysical Company ASA, Petroleum GeoServices and Multi Klient Invest AS
News Release – NEB Authorizes 2D Seismic Survey in Baffin Bay and Davis Strait- News Release – Authorizes 2D Seismic Survey in Baffin Bay and Davis Strait 72 KB]
- Geophysical Operations Authorization Letter with Terms and Conditions
- Canada Oil and Gas Operations Act (COGOA) Environmental Assessment Report for the NORTHEASTERN CANADA 2D SEISMIC SURVEY (Baffin Bay/Davis Strait)
- 2013-10-22
16 October 2013: TGS NOPEC Geophysical Company ASA (TGS), Petroleum GeoServices (PGS) and MultiKlient Invest AS (MKI) NorthEastern Canada 2D Seismic Exploration Survey – Request for Extension on Public Comment Period - 2013-09-18
13 September 2013: Process Update for TGS NOPEC Geophysical Company ASA (TGS), Petroleum Geo-Services (PGS) and Multi Klient Invest AS (MKI) NorthEastern Canada 2D Seismic Survey (the Project) - 2013-06-06
31 May 2013: TGS-NOPEC Geophysical Company ASA (TGS) , Petroleum GeoServices (PGS) and Multi Klient Invest (MKI) Application for NorthEastern Canada 2D Seismic Survey (the Project) under section 5.1(b) of the Canada Oil and Gas Operations Act – Incomplete Application - 2013-06-03
15 May 2013: Potential Effect on Species Listed Under the Species at Risk Act – Notification to the Minister of Environment - 2013-06-03
15 May 2013: Potential Effect on Species Listed Under the Species at Risk Act – Notificaiton to the Minister of Fisheries and Oceans - 2013-05-21
10 May 2013: TGS-NOPEC Geophysical Company ASA, Petroleum GeoServices and MultiKlient Invest (TGS/PGS/MKI) NorthEastern Canada 2D Seismic Exploration Survey Geophysical Operations Authorization - 2013-05-13
Transcripts – Public Review of the TGS NOPEC Geophysical ASA (TGS), Petroleum Geo-Services (PGS) and Multi Klient Invest (MKI)
Northeastern Canada 2D Seismic Survey Application
2 May 2013 – Iqaluit [PDF 381 KB]
1 May 2013 – Qikiqtajuak [PDF 540 KB]
30 April 2013 – Clyde River [PDF 412 KB]
29 April 2013 – Pond Inlet [PDF 716 KB] - 2013-04-04
4 April 2013: TGS NOPEC Geophysical Company ASA, Petroleum Geoservices and MultiKlient Invest (TGS/PGS/MKI) NorthEastern Canada 2D Seismic Exploration Survey (the Project) National Energy Board Information Request No. 4 – Granting Request for Extension - 2013-04-03
22 March 2013: Public Meetings for TGS NOPEC Geophysical Company ASA (TGS), Petroleum GeoServices (PGS) and Multi Klient Invest (MKI) NorthEastern Canada 2D Seismic Survey (the Project) - 2013-04-03
22 March 2013: Process Update for TGS NOPEC Geophysical Company ASA (TGS), Petroleum GeoServices (PGS) and Multi Klient Invest (MKI) NorthEastern Canada 2D Seismic Survey (the Project) - 2013-04-03
19 March 2013: TGS NOPEC Geophysical Company ASA, Petroleum GeoServices and Multi Klient Invest (TGSIPGS/MKI) NorthEastern Canada 2D Seismic Exploration Survey National Energy Board Information Request No. 4 - 2012-10-09
8 August 2012: MKI consent to waive privilege - 2012-10-09
25 July 2012: Extension request approval #2 for MKI's response to NEB's request for consent - 2012-10-09
16 July 2012: Extension request approval for MKI's response to NEB's request for consent - 2012-10-09
9 July 2012: Letter to MKI regarding request for consent - 2012-06-19
30 May 2012: National Energy Board Information Request No.3 - 2012-04-25
20 April 2012: Granting Extension Request for Information Request No. 2 to MKI - 2012-04-12
4 April 2012: National Energy Board Information Request No. 2 - 2012-01-17
9 January 2012: Notification of Stopping Review of MKI Application for 2D Seismic Survey in Baffin Bay 2011 - 2011-10-11
Process Update for TGS NOPEC Geophysical Company ASA, Petroleum GeoServices and MultiKlient Invest (MultiKlient) NorthEastern Canada 2D Seismic Survey (the Project) - 2011-10-06
Meeting with TGS-NOPEC Geophysical Company ASA (TGS) and Petroleum GeoServices (PGS) (MultiKlient Invest AS (MKI) a wholly owned subsidiary of PGS) - 2011-09-08
Letter to TGS/PGS/Multi Klient Invest regarding 2011 NorthEastern Canada 2D Seismic Exploration Survey National Energy Board Information Request No. 1 - 2011-07-13
Letter to TGS/PGS/Multi Klient Invest AS regarding 2011 NorthEastern Canada 2D Seismic Survey Process Outline - 2011-06-24
14 June 2011: Decision Record – Canadian Environmental Assessment Act, section 18(3) [PDF 503 KB] - 2011-06-24
10 June 2011: Scope of the Environmental Assessment for the Proposed TGS/PGS Multi Klient 2011 NorthEastern Canada 2D Seismic Program [PDF 62 KB] - 2011-01-26
Federal Coordination Notice [PDF 164 KB]
Transcripts
- 2 May 2013 – Iqaluit [PDF 381 KB]
- 1 May 2013 – Qikiqtajuak [PDF 540 KB]
- 30 April 2013 – Clyde River [PDF 412 KB]
- 29 April 2013 – Pond Inlet [PDF 716 KB]
TGS-NOPEC Geophysical Company ASA, Petroleum GeoServices and Multi Klient Invest AS (TGS/PGS Multi Klient)
- 2015-05-28
Program Start Delay – 25 May 2015 [PDF 22 KB] - 2014-12-10
Request for a change to the date on the Geophysical Operations Authorization – 1 October 2014 [PDF 39 KB] - 2014-07-21
GS/PGS/Multi Klient has notified the NEB that they are preparing to commence operation of the approved NorthEastern Canada 2D Seismic Survey in the 2015 season – 16 July 2014 [PDF 57 KB] - 2013-11-12
Response from MKI to letters of comments – 8 November 2013 [PDF 53 KB] - 2013-10-10
MKI response to NEB process update letter from 13 September 2013 – 20 September 2013 [PDF 365 KB] - 2013-09-06
MKI Response to NEB Letter from May 31st 2013 with Request for Additional Information – 30 August 2013 [PDF 200783 KB] - 2013-04-16
Response to NEB IR Request No. 4 received 16 April 2013 [PDF 529 KB] - 2013-04-01
Request for extension regarding NEB Information Request N. 4 Received 1 April 2013 [PDF 56 KB] - 2013-02-18
TGS/PGS/MKI email sent to communities regarding future meetings – 1 February 2013 [PDF 44 KB] - 2013-02-18
Questions and Responses from June and October Community Information Sessions – November 2012 [PDF 50 KB] - 2013-02-18
TGS/PGS/MKI Northeastern Canada 2D Seismic Exploration Survey Supplementary Report – November 2012 Meetings [PDF 70 KB] - 2013-02-15
TGS/PGS/MKI Northeastern Canada 2D Seismic Exploration Survey Addendum to November/December 2012 Community Engagement Report [PDF 119 KB] - 2013-01-14
Updated Fisheries Catch Data – Nunavut Government Information Request Response from MKI/PGS/TGS [PDF 37410 KB] - 2013-01-10
TGS/PGS/MKI Northeastern Canada 2D Seismic Exploration Survey November/December 2012 Community Engagement Report [PDF 114 KB] - 2013-01-10
TGS/PGS/MKI Northeastern Canada 2D Seismic Exploration Survey June 2012 Community Engagement Report [PDF 129 KB] - 2012-11-07
Letter to the NEB regarding community meeting schedule received 7 November 2012 [PDF 84 KB] - 2012-11-02
TGS/PGS/MKI Northeastern Canada 2D Seismic Exploration Survey October 2012 Community Engagement Report received 2 November 2012 [PDF 133 KB] - 2012-06-19
Response to NEB IR Request No. 3 – Public Engagement Notification received 7 June 2012 [PDF 13 KB] - 2012-06-19
Response to NEB IR Request No. 3 received 7 June 2012 [PDF 54 KB] - 2012-05-08
Response to NEB Information Request No. 2 received 3 May 2012 [PDF 93 KB] - 2012-04-20
Request for extension regarding NEB Information Request No. 2 received 19 April 2012 [PDF 28 KB] - 2012-04-19
Request for extension regarding NEB Information Request No. 2 received 19 April 2012 [PDF 28 KB] - 2012-03-12
Response to NEB Information Request #1 received on 2 March 2012 [PDF 7002 KB] - 2011-07-12
Letter to Nigel Qaumariaq, Qikiqtani Inuit Association [PDF 16 KB] - 2011-05-05
Environmental Impact Assessment for the Proposed Marine 2D Seismic Reflection Survey Baffin Bay and Davis Strait Offshore Eastern Canada [PDF 5339 KB] - 2014-09-16
Project Description for the TGS/PGS 2011 Northeastern Canada 2D Marine Seismic Survey – 8 January 2011 [PDF 86 KB]
Letters of Comment
- 2013-11-06
Arctic Fishery Alliance
Comments from Arctic Fishery Alliance dated 31 October 2013 [PDF 214 KB] - 2013-10-16
Qikiqtani Inuit Association
Comments from Qikiqtani Inuit Association (QIA) dated 15 October 2013 [PDF 1486 KB] - 2013-10-16
Jennifer Brisksky
Comments from Jennifer Brisksky dated 15 October 2013 [PDF 40 KB] - 2013-10-16
Jennifer Brisksky
Comments from Jennifer Brisksky dated 14 October 2013 [PDF 1752 KB] - 2013-10-16
Jennifer Brisksky
Comments from Jennifer Brisksky [PDF 149 KB] - 2013-10-16
Arctic Fishery Alliance L.P.
Letter from Arctic Fishery Alliance L.P. dated 10 October 2013 requesting extension to deadline for comments [PDF 87 KB] - 2013-06-18
Mittimatalik Hunters and Trappers Organization
Letter from the Mittimatalik Hunters and Trappers Organization received 14 June 2013 [PDF 108 KB] - 2012-05-18
Qikiqtani Inuit Association
15 May 2012: Qikiqtani Inuit Association Letter of Comment [PDF 30 KB] - 2013-05-17
Municipality of Clyde River and Nammautaq Hunters and Trappers Organization
Letter to the NEB from the Municipality of Clyde River and Nammautaq Hunters and Trappers Organization [PDF 225 KB] - 2013-05-16
Arctic Fishery Alliance L.P.
Letter of Comment from Arctic Fishery Alliance received 30 April 2013 [PDF 194 KB] - 2013-05-15
Residents of Pond Inlet
Comments collected by Jennifer on behalf of Residents of Pond Inlet Received 3 May 2013 [PDF 3240 KB] - 2013-05-15
Qikiqtani Inuit Association
Request for Extension from the Qikitani Inuit Associaton Received 3 May 2013 [PDF 322 KB] - 2012-04-11
Environnement Canada (EC)
30 March 2012: Environment Canada Letter of Comment [PDF 30 KB] - 2011-06-24
Arctic Fisheries Alliance
9 June 2011: Arctic Fisheries Alliance Letter of Comment regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB [PDF 1747 KB] - 2011-06-24
Baffin Fisheries Coalition
1 June 2011: Baffin Fisheries Coalition Letter of Comment regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB [PDF 1224 KB] - 2011-06-24
Environment Canada (EC)
28 May 2011: EC Letter of Comment regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB [PDF 44 KB] - 2011-06-24
Fisheries and Oceans Canada (DFO)
10 June 2011: DFO Letter of Comment regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB [PDF 26 KB] - 2011-06-24
Government of Nunavut
10 June 2011: Government of Nunavut Letter of Comment regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB [PDF 82 KB] - 2011-06-24
Qikiqtani Inuit Association
13 June 2011: Qikiqtani Inuit Association Letter of Comment regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB [PDF 1006 KB] - 2011-06-24
Shari Gearheard- 31 May 2011: Letter from Shari Gearheard regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB – Part 1 [PDF 20 KB]
- 31 May 2011: Letter from Shari Gearheard regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB – Part 2 [PDF 9 KB]
- 31 May 2011: Letter from Shari Gearheard regarding the TGS/PGS Multi Klient 2D seismic project, submitted to the NEB – Part 3 [PDF 45 KB]
- 31 May 2011: Petition – Community of Clyde River, sent from Shari Gearheard – Part 1 [PDF 494 KB]
- 31 May 2011: Petition – Community of Clyde River, sent from Shari Gearheard – Part 2 [PDF 445 KB]
- 31 May 2011: Petition – Community of Clyde River, sent from Shari Gearheard – Part 3 [PDF 143 KB]
Additional information
Christy Wickenheiser
Environmental Specialist
Canada Energy Regulator
Email: christy.wickenheiser@cer-rec.gc.ca
Telephone: 403-299-3869
Telephone (toll free): 1-800-899-1265
Facsimile: 403-292-5503
Facsimile (toll free): 1-877-288-8803
- Date modified: